Contruction project scheduling and control / Saleh Mubarak
By: Mubarak, Saleh
.
Material type: 





Item type | Current location | Home library | Call number | Status | Date due | Barcode |
---|---|---|---|---|---|---|
![]() |
Biblioteca Central | Biblioteca Central | 005.8:624, M941 (Browse shelf) | Para Etiquetar | 53223 |
Browsing Biblioteca Central Shelves Close shelf browser
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||||
005.8:62, A832 Introducción al proyecto / | 005.8:62, A832 Introducción al proyecto / | 005.8:62, A832 Introducción al proyecto / | 005.8:624, M941 Contruction project scheduling and control / | 005.9, P1321 Conceptual cost estimating manual / | 005.91, F884 Los circuitos y otras herramientas de gestión / | 005.91, M553 Administración aplicada : |